🏢
Manufacturing Excellence
Our facility covers an area of 12,000 square meters, equipped with more than 20 production lines and a dedicated team of about 200 skilled employees. We specialize in designing and manufacturing high-quality medals, badge pins, key chains, coins, rings, and bottle openers for major sporting events and corporate needs worldwide.
As a leading manufacturer, we provide innovative solutions and free design services. With an experienced R&D team and strict quality control systems, we ensure excellent quality and on-time delivery. All products comply with environmental protection standards, and we hold certifications including ISO9001, ISO14001, Sedex, and BSCI.
🚀
Our Advantages
✅
Professional Scale: Factory with 300-350 skillful workers and 20+ years of experience.
♻️
Eco-Friendly: Commitment to environmental protection materials and sustainable production.
🎨
Free Design: Professional designers to turn your ideas into reality with 2D/3D mockups.
🛡️
Quality Control: Comprehensive integrity QC system and third-party inspection support.
🛠️
Service Workflow
1. Inquiry: Rapid response within 10 minutes to 2 hours with pricing details.
2. Payment: 30% deposit for production, balance due after quality inspection.
3. Logistics: Flexible shipping options via express, air, or sea with professional forwarders.
4. Feedback: Real-time production updates and post-delivery follow-up.
❓
Frequently Asked Questions
Q1: Are you a direct manufacturer or a trading company?
We are a direct manufacturer with over 20 years of experience. Our 12,000 square meter facility is Sedex, ISO9001, and BSCI audited.
Q2: Can I get a free design for my custom patches?
Yes! We provide free 2D and 3D design services to confirm all details before mass production or sampling.
Q3: What is the Minimum Order Quantity (MOQ)?
Our standard MOQ is 100 pieces per design, allowing for both small batch customization and large scale production.
Q4: How long does sampling and mass production take?
Sampling typically takes 3-5 days. Mass production is completed within 12-15 days after sample approval and deposit.
Q5: How do you handle quality control?
We provide feedback at every production step and allow third-party inspection companies to verify quality during or after production.
Q6: What are your payment and delivery terms?
We accept EXW, FOB, and C&F terms. Payment is usually 30% deposit and 70% balance before shipment after inspection.